Neyland Stadium Renovation

University of Tennessee

Knoxville, Tennessee, USA

In association with McCarty Holsaple McCarty, Architects

 

Phase I of the master plan, completed in 2006 at a cost of $26 million, involved the addition of the East Club Seats, renovation and widening of the north lower concourse, the addition of LED signage, and the addition of extra restrooms and concessions. The East Club Seats, built on the East Upper Deck, includes 422 seats and an adjoining club room overlooking the Tennessee River.

 

Phase II of the master plan, completed in 2008 at a cost of $27.4 million, involved the renovation and widening of the west lower concourse, renovations to the Peyton Manning Locker Complex and the concourse connecting it with Shields-Watkins Field, and the construction of the Lauricella Center for Letter Winners and the Stokely Family Media Room. The Lauricella Center for Letter Winners sits adjacent to the locker complex, and provides a gathering area for athletes, coaches, and their family members. The Stokely Family Media Room provides a setting for press conferences and coach and player interviews.

 

Phase III of the master plan, completed in 2010 at a cost of $83 million, included the construction of the West Club Seats, improvements to the Executive Suites and press box, renovations to the west top level concourse, the addition of elevators and stairwells to the West Side, the creation of the Gate 21 Plaza and other entry plazas, the construction of the Tennessee Terrace, and the installation of a statue of General Neyland to the west entrance. The West Club Seats are similar to the East Club Seats, with 422 seats and an adjoining club room. The Tennessee Terrace features 1,782 priority seats, with an adjacent climate-controlled concourse area, overlooking the west sideline.

 

Phases IV and V will involve renovation of the south and east concourses and the creation of an entry plaza at Gate 10.